I have a lot of catching up to do as far as posts and logs.
Tonight, I drilled the left wing fuel tank Z brackets, as per Dan Checkway's method. The inboard Z bracket was drilled and clecoed to #30. Once the five holes were drilled and clecoed, I removed the left wing leading edge and drilled the Z bracket holes for the outboard Z bracket.