KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 build
' style=
Date:  9-8-2011
Number of Hours:  1.00
Manual Reference:  Page 7-5
Brief Description:  Left wing fuel tank part #3

I have a lot of catching up to do as far as posts and logs.

Tonight, I drilled the left wing fuel tank Z brackets, as per Dan Checkway's method. The inboard Z bracket was drilled and clecoed to #30. Once the five holes were drilled and clecoed, I removed the left wing leading edge and drilled the Z bracket holes for the outboard Z bracket.

Part 2 on the next post this evening
' style=

Inboard Z bracket drilled

Inboard Z bracket drilled

' style=

Leading edge removed

Leading edge removed

' style=

Outboard Z bracket drilled

Outboard Z bracket drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.